David Johnson Golf Design LLC
1. Planning
view details
Routing Plan
Strategy Plan
Strategic Narrative
Scope of Work
Construction Narrative
Estimated Pre-Construction Costs
Golf Course Related Engineering Costs
Design Costs
Travel Costs
Soils and Water Testing Costs
Surveying Costs
Estimated Hard Construction Costs and Confirmations
Mobilization
Clearing Costs
Grading Costs
Excavation Costs
Shaping Costs
Drainage Costs
Irrigation Costs
Feature Construction Costs (putting surfaces, tees, bunkers, etc.)
Abutments & Retaining Walls
Water Feature Costs
Lake Construction Costs (lining if required, water level controls, outfall structures if required)
Cart Path Costs
Bunker Sand Costs
Soil Amendment Costs
Topsoil Management Costs
Finishing Costs
Grassing Costs
Landscaping Costs
Estimated Post Construction Costs
Complete Project Budget Definition
Complete Construction Schedule
Color Rendering
2. Working Drawings
view details
Staking & Clearing Plan
Erosion & Sediment Control Plan (with outside Engineer)
Contour Plan
Drainage Plan
Storm Drainage In Concert With Project Engineer
Specific Golf Course Drainage
Grassing Plan
Types
Rates
Soil Amendments
Application Windows
Irrigation (to be provided by outside contract)
Design
Field Direction
Instruction
Control System
Volume Delivery Service
Cut & Fill Plan
Cart Path Plan
Putting Surface/Green Area Plans
Special Water Features
Abutment and Retaining Wall Plans
Shelter Locations
Clubhouse Area Site Plan (with Land Planner)
Maintenance Area Site Plan (with Land Planner)
Complete Practice Facility Plan
Putting Green Plan
Landscape Considerations
All Specifications For Above
3. Bid / Negotiation
view details
Complete Bid Package
Working Drawings (above)
Technical Specifications
General Conditions
Bid For Contract
Construction Scope of Work
Special Instructions
Contractor Qualification
Pre-Bid Conference
Post-Bid Analysis
Price Negotiation
Selection Consultation & Logic
Construction Agreement Document
4. Construction Process
view details
Specific Approvals Of Levels Of Construction Completion
Verification of Centerlines
Clearing Approval
Rough Grading Approval
Storm Drainage Approval
Golf Drainage Installation Approval
All Landform Approvals
Green Sub-grade Approvals
Irrigation Head Placement Approval
Irrigation Wet Well and Slab Installation Approval
General Irrigation
Installation Observation
Controller & Quick Coupler Location, Approval
Temporary Golf Course Drainage Installation Approval
Permanent Golf Course Drainage Installation Approval
Tee Construction Sub-grade Approval
Final Tee Installation Approval
Bunker Drainage Installation Approval
Bunker Sand Approval
Putting Surface Materials Confirmation (by USGA Lab Report)
Cart Path Location Approval
Abutment Location Approval
Abutment Material Approval
Soil Management Approval
Final Grade Approval
Pre-Grassing Finish Approval
Final Grassing Lines Approval
Sod Installation Recommendations and Approval
Water Feature Approval
Notice of Substantial Completion
Draw Request Verification and Recommendations
Completion of Final Punch List
Execution of Final Punch List or Automatic Retention
Change Order Verification and Negotiation
Verification and Monitoring Of Schedule Progress
Field Staking Of Landscaping
5. Post Construction
view details
Grow-in Budget & Consultation