Design Process
- Routing Plan
- Strategy Plan
- Strategic Narrative
- Scope of Work
- Construction Narrative
- Estimated Pre-Construction Costs
- Golf Course Related Engineering Costs
- Design Costs
- Travel Costs
- Soils and Water Testing Costs
- Surveying Costs
- Estimated Hard Construction Costs and Confirmations
- Mobilization
- Clearing Costs
- Grading Costs
- Excavation Costs
- Shaping Costs
- Drainage Costs
- Irrigation Costs
- Feature Construction Costs (putting surfaces, tees, bunkers, etc.)
- Abutments & Retaining Walls
- Water Feature Costs
- Lake Construction Costs (lining if required, water level controls, outfall structures if required)
- Cart Path Costs
- Bunker Sand Costs
- Soil Amendment Costs
- Topsoil Management Costs
- Finishing Costs
- Grassing Costs
- Landscaping Costs
- Estimated Post Construction Costs
- Complete Project Budget Definition
- Complete Construction Schedule
- Color Rendering
- Staking & Clearing Plan
- Erosion & Sediment Control Plan (with outside Engineer)
- Contour Plan
- Drainage Plan
- Storm Drainage In Concert With Project Engineer
- Specific Golf Course Drainage
- Grassing Plan
- Types
- Rates
- Soil Amendments
- Application Windows
- Irrigation (to be provided by outside contract)
- Design
- Field Direction
- Instruction
- Control System
- Volume Delivery Service
- Cut & Fill Plan
- Cart Path Plan
- Putting Surface/Green Area Plans
- Special Water Features
- Abutment and Retaining Wall Plans
- Shelter Locations
- Clubhouse Area Site Plan (with Land Planner)
- Maintenance Area Site Plan (with Land Planner)
- Complete Practice Facility Plan
- Putting Green Plan
- Landscape Considerations
- All Specifications For Above
- Complete Bid Package
- Working Drawings (above)
- Technical Specifications
- General Conditions
- Bid For Contract
- Construction Scope of Work
- Special Instructions
- Contractor Qualification
- Pre-Bid Conference
- Post-Bid Analysis
- Price Negotiation
- Selection Consultation & Logic
- Construction Agreement Document
- Complete Bid Package
- Specific Approvals Of Levels Of Construction Completion
- Verification of Centerlines
- Clearing Approval
- Rough Grading Approval
- Storm Drainage Approval
- Golf Drainage Installation Approval
- All Landform Approvals
- Green Sub-grade Approvals
- Irrigation Head Placement Approval
- Irrigation Wet Well and Slab Installation Approval
- General Irrigation
- Installation Observation
- Controller & Quick Coupler Location, Approval
- Temporary Golf Course Drainage Installation Approval
- Permanent Golf Course Drainage Installation Approval
- Tee Construction Sub-grade Approval
- Final Tee Installation Approval
- Bunker Drainage Installation Approval
- Bunker Sand Approval
- Putting Surface Materials Confirmation (by USGA Lab Report)
- Cart Path Location Approval
- Abutment Location Approval
- Abutment Material Approval
- Soil Management Approval
- Final Grade Approval
- Pre-Grassing Finish Approval
- Final Grassing Lines Approval
- Sod Installation Recommendations and Approval
- Water Feature Approval
- Notice of Substantial Completion
- Draw Request Verification and Recommendations
- Completion of Final Punch List
- Execution of Final Punch List or Automatic Retention
- Change Order Verification and Negotiation
- Verification and Monitoring Of Schedule Progress
- Field Staking Of Landscaping
- Grow-in Budget & Consultation